1 Park Avenue, Mosman  
Land size:918 sqm
Backyard:west facing
Slope:Steep
Elevation Data
Front [A]CenterBack [B]
11.87m8.44m17.49m
The back of the land is 5.62m higher than the front.
Degree of slope is 13 percent.
(Average building cost of $6,000 for every 1 metre of fall)
 
Left [C]CenterRight [D]
8.67m8.44m13.34m
The right of the land is 4.67m higher than the left.
Degree of slope is 22 percent.
(Average building cost of $9,000 for every 1 metre of sideway fall)

Enlarge map

© 2015 - 中文版