[2008年01月02日] VPO3 - Removal x 1 Removal of vegetation in a VPO3
[2012年03月30日] Subdivision of Land (1 to 9 Lots) Two (2) lot subdivision and removal of one (1) tree in a Vegetation Protection Overlay 3
[2013年08月12日] Removal of Vegetation Removal of three native trees within a Vegetation Protection Overlay 3
[2014年01月09日] 3 New Dwellings Construction of two or more dwellings on a lot; Creation of an access to a road in a Road Zone Category 1 and Removal of native vegetation. Cost $700,000
[2014年07月21日] Demolition of Dwelling and Garage. Cost $7,200
[2016年09月14日] Subdivision of Land (1 to 9 Lots) Three (3) lot Subdivision