Park Orchards 平均房價House 價格比去年下降6% . 周邊地區Park Orchards Median RentThe House rent is 上升23% .
| X"6-10 Stintons Road, Park Orchards" 附近的改建 |
| 08 Oct 2003 | WITHDRAWN Removal of 12 trees | | 距離: 27 米 | 地圖位置 | 街景 |
|
| 31 May 1993 | NATIVE VEG REM. Estimated Cost: $800 | 12 Dec 1994 | DWELLING EXTS. Estimated Cost: $150000 | 03 Apr 1995 | GARAGE | 07 Jun 1995 | GREENHOUSE. Estimated Cost: $2000 | 07 Mar 2002 | The use and development of a shed. Estimated Cost: $13800 | 28 Jan 2003 | WITHDRAWN Vegetation removal | | 距離: 132 米 | 地圖位置 | 街景 |
|
| 16 Mar 1992 | A DWELLING. Estimated Cost: $85000 | | 距離: 201 米 | 地圖位置 | 街景 |
|
| 26 Sep 1995 | WITHDRAWN EARTHWORKS | 19 Apr 2012 | Buildings and works associated with the erection of a cyclone wire boundary fence and earthworks to create a level area. Estimated Cost: $30000 | | 距離: 242 米 | 地圖位置 | 街景 |
|
| 01 Oct 2019 | Buildings and works for the construction of fencing | | 距離: 253 米 | 地圖位置 | 街景 |
|
| 21 Dec 2012 | Construction of a dwelling (replacement dwelling) and associated works.. Estimated Cost: $500000 | 05 Sep 2016 | Change of Use - To use the land for the purpose of egg farming. Estimated Cost: $15000 | | 距離: 299 米 | 地圖位置 | 街景 |
|
| 05 Nov 1987 | TENNIS CRT LTG | 29 Oct 2012 | Buildings and works for the construction of a shed, front and side fencing, external stairs, earthworks associated with the existing driveway and vegetation removal (including retrospective native tree removal). Estimated Cost: $90000 | 05 Aug 2014 | Buildings and works associated with the construction of a dwelling, storage shed and vegetation removal. Estimated Cost: $3000000 | 24 Oct 2014 | Alterations and additions to the existing dwelling.. Estimated Cost: $15000 | 16 Dec 2014 | Buildings and works associated with the alterations and additions to the existing dwelling, consisting of a pergola, deck and spa, installation of two (2) rainwater tanks, resurfacing of the existing tennis court and earthworks associated with the in | 15 Sep 2015 | Construction of single dwelling, storage shed and vegetation removal. Estimated Cost: $2500000 | | 距離: 468 米 | 地圖位置 | 街景 |
|
| 19 Aug 1996 | SHED. Estimated Cost: $26600 | 12 Nov 1998 | EARTHWORKS EARTHWORKS LOT 3 LP56772 MULLUM | 08 Feb 1999 | EARTHWORKS EARTHWORKS LOT 3 LP 56772 MULLUM. Estimated Cost: $5000 | 14 May 2003 | Front fence and gates. Estimated Cost: $35000 | 20 May 2003 | Alterations and additions to dwelling. Estimated Cost: $550000 | | 距離: 332 米 | 地圖位置 | 街景 |
|
| 13 Jul 2019 | Buildings and works for the construction of a shed | | 距離: 348 米 | 地圖位置 | 街景 |
|
| 17 Oct 2001 | ALTERATIONS ALTERATIONS AND ADDITIONS TO A DWELLING Adam Crupi is the planner. Estimated Cost: $70000 | 30 Jul 2004 | Alterations and additions. Estimated Cost: $22000 | | 距離: 388 米 | 地圖位置 | 街景 |
|
| | |