Thornbury 平均房價House 價格比去年下降2% . 周邊地區Alphington | $1,834,800 | Brunswick East | $1,291,700 | Coburg | $1,208,200 | Fairfield | $1,613,400 | Ivanhoe | $1,546,800 | Northcote | $1,625,000 | Preston | $1,128,600 | Thornbury Median RentThe House rent is 上升9% .
| X"335 Clarendon Street, Thornbury" 附近的改建 |
| 19 Jan 2011 | Shed | 05 Feb 2013 | Fire Safety Upgrade Works. Amendment: Supply, install and connect a sprinkler in each skylight (8 units) | | 距離: 0 米 | 地圖位置 | 街景 |
|
| 09 Mar 2010 | Extension/Alterations (Print Room) Victorian School of Languages | 14 Aug 2019 | Alterations to existing Class Rooms | | 距離: 78 米 | 地圖位置 | 街景 |
|
| 17 Jul 2012 | Use of the existing building for the purpose of motor repairs (mechanical repairs) and a reduction in the car parking requirement | | 距離: 121 米 | 地圖位置 | 街景 |
|
| 09 Feb 2016 | Medium density development comprising the construction of 22 dwellings within three (3), three (3) storey buildings above a basement and reduction of the standard visitor car parking | 24 May 2016 | Construction of New Residential Development (22 Apartments and Basement Carpark) Stage 2: Basement Works Only | 12 Oct 2016 | Medium density development comprising the construction of 22 dwellings within three (3), three (3) storey buildings above a basement and reduction of the standard visitor car parking | 18 Jan 2017 | Twenty Two (22) Lot Subdivision as shown on the plans accompanying the application | 15 Feb 2017 | Construction of New Residential Development (22 Apartments and Basement Carpark) Stage 3: Full Structural Works & Hydraulics Only; & Change of Building Company | 04 Sep 2017 | Construction of New Residential Development (22 Apartments and Basement Carpark) Stage 4: Remainder of Works | | 距離: 134 米 | 地圖位置 | 街景 |
|
| 13 Jul 2009 | A two (2) lot subdivision as shown on the plans accompanying the application. | 14 Dec 2011 | The proposed construction of a building as shown on the plans accompanying the application. | 18 Feb 2016 | Construction of 22 Apartments and Basement Carpark | | 距離: 117 米 | 地圖位置 | 街景 |
|
| 13 Jul 2009 | A two (2) lot subdivision as shown on the plans accompanying the application. | 29 Oct 2012 | Proposal to retain existing marble factory/warehouse and to develop the remaining site as nine (9) boutique warehouses and a coffee shop as shown on the plans accompanying the application | 17 Mar 2015 | Proposed development of land for the purpose of 20 townhouse dwellings including waiving visitor car park requirement in acoradance with the plans accompaning this application | 19 Oct 2015 | Demolition of 3 Factories | | 距離: 138 米 | 地圖位置 | 街景 |
|
| 26 Aug 2013 | Construction of a replacement building (carport) as shown on the plans accompanying the application. | | 距離: 159 米 | 地圖位置 | 街景 |
|
| 06 Nov 2009 | Alteration to existing Building | 16 Dec 2019 | Proposed installation of light poles at John Cain Memorial Park | | 距離: 139 米 | 地圖位置 | 街景 |
|
| 02 Feb 2011 | Internal Alterations to Dwelling | | 距離: 167 米 | 地圖位置 | 街景 |
|
| 05 Apr 2011 | A residential development comprised of the construction of sixty-two (62) dwellings (2-storey and 3-storey) | 03 Feb 2012 | A residential development comprised of the construction of sixty-two (62) dwellings (2-storey and 3-storey) | 24 Feb 2012 | A residential development comprised of the construction of sixty-two (62) dwellings (2-storey and 3-storey) | 31 May 2012 | A residential development comprised of the construction of sixty-two (62) dwellings (2-storey and 3-storey) | 16 Oct 2012 | Construction of attached Dwellings (62) Stage 1 Blocks A, B, C and Substation. Occupancy Permit issued for Unit 3 & 4 on 2/7/2013 Occupancy Permit issued for Unit 1 & 2 on 9/7/2013 Occupancy Pemit issued for Unit 5 on 23/7/2013 Occupancy Pemit issued | 12 Dec 2012 | 62 Lot subdivision, in 4 stages, of approved development. | 12 Dec 2012 | 62 Lot subdivision, in 4 stages, of approved development. | 13 Dec 2012 | Sixty-Two (62) lot (staged) subdivision generally in accordance with the endorsed plans | 25 Jan 2013 | 62 Lot subdivision, in 4 stages, of approved development. | 02 Apr 2014 | Construction of attached Dwellings (62) Stage 2 Blocks D & E Occupancy Permit issued on 3/10/2014 for Block D - Lot 14,15,16,17,18,19 Occupancy Permit issued on 12/12/14 for Block D & E Unit 20,21,23,24,25,26,27,28 | 16 Mar 2015 | Construction of attached Dwellings (62) Stage 3: Block I | 15 Apr 2015 | A residential development comprised of the construction of sixty-two (62) dwellings (2-storey and 3-storey) | 29 Jul 2015 | Construction of attached Dwellings (62) Stage 4: Block H (Conditional - Footings/Slabs and Civil Works Only) & Entry Gantry | 07 Apr 2016 | Construction of attached Dwellings (62) Stage 5: Blocks F & G and Entry Arbor | | 距離: 156 米 | 地圖位置 | 街景 |
|
| | |