Warrandyte 平均房價House 價格比去年下降5% . 周邊地區Doncaster East | $1,635,500 | Donvale | $1,560,900 | Eltham | $1,261,400 | Park Orchards | $2,000,200 | Templestowe | $1,712,700 | Warrandyte South | $1,913,700 | Wonga Park | $1,494,100 | Warrandyte Median RentThe House rent is 上升40% .
| X"3 Glamis Street, Warrandyte" 附近的改建 |
| 04 May 1988 | Tennis Court Illumination on the land in accordance with the endorsed plan | 05 Aug 2015 | Construction of single storey dwelling. Estimated Cost: $600000 | | 距離: 30 米 | 地圖位置 | 街景 |
|
| 22 Dec 1998 | Extensions. Estimated Cost: $60000 | 06 Jan 2004 | WITHDRAWN Extensions to existing dwelling.. Estimated Cost: $230000 | | 距離: 44 米 | 地圖位置 | 街景 |
|
| 25 Jan 1994 | DWELLING/WORKS | 15 Jul 2015 | Alterations and additions to an existing dwelling. Estimated Cost: $8000 | | 距離: 57 米 | 地圖位置 | 街景 |
|
| 17 Sep 1993 | A DWELLING. Estimated Cost: $230000 | | 距離: 98 米 | 地圖位置 | 街景 |
|
| 09 Mar 2006 | Vegetation removal | 10 Sep 2007 | Works associated with the asphalting of a driveway. Estimated Cost: $5600 | 05 Nov 2014 | Buildings and works associated with the construction of a part two-storey dwelling (replacement dwelling), and associated vegetation removal. Estimated Cost: $750000 | | 距離: 120 米 | 地圖位置 | 街景 |
|
| 31 Oct 2002 | WITHDRAWN Construction of a single-storey dwelling and associated earthworks and tree removal and consent for earthworks outside the building envelope.. Estimated Cost: $300000 | 25 May 2005 | Construction of a single storey dwelling and associated earthworks and vegetation removal. Estimated Cost: $250000 | 07 Jan 2014 | Buildings and works, including vegetation removal associated with the construction of a dwelling. Estimated Cost: $400000 | | 距離: 127 米 | 地圖位置 | 街景 |
|
| 20 May 2004 | WITHDRAWN Vegetation removal | | 距離: 132 米 | 地圖位置 | 街景 |
|
| 06 Jun 1997 | DWELLING. Estimated Cost: $210000 | 08 Dec 2005 | Installation of an inground swimming pool.. Estimated Cost: $37000 | 27 Oct 2009 | Development of the land for a games room, associated earthworks and trees removal. Estimated Cost: $50000 | | 距離: 139 米 | 地圖位置 | 街景 |
|
| 03 Sep 1998 | SWIMMING POOL SWIMMING POOL LOT 3 PS 401601N MULLUM MULLUM | | 距離: 151 米 | 地圖位置 | 街景 |
|
| 20 Oct 2003 | Construction of a dwelling and associated earthworks and vegetation removal.. Estimated Cost: $250000 | 22 Feb 2011 | LAPSED Construction of a single storey dwelling and associated vegetation removal. Estimated Cost: $300000 | 21 Oct 2013 | Buildings and works, including vegetation removal associated with the construction of a dwelling,.. Estimated Cost: $500000 | 17 Aug 2016 | Native Vegetation Removal - two native trees | | 距離: 129 米 | 地圖位置 | 街景 |
|
| | |