Beaumaris 平均房價House 價格比去年上升4% . 周邊地區Beaumaris Median RentThe House rent is 上升12% .
| X"401 Beach Road, Beaumaris" 附近的改建 |
| 30 Apr 2008 | Removal of Vegetation Removal of vegetation in a Vegetation Protection Overlay 3. Cost $300,000 | 13 May 2009 | Additions and Alterations to Dwelling. Cost $25,000 | 14 May 2009 | VPO3 - Removal x 1 Removal of one (1) tree in a Vegetation Protection Overlay 3 | 06 Oct 2010 | VPO3 - Removal x 9 Removal of five (5) trees in a Vegetation Protection Overlay 3 | 18 May 2011 | 1 Dwelling - New - DDO Construction of a double storey dwelling with floor to ceiling heights exceeding 3.5 metres in a Design and Development Overlay 1. Cost $300,000 | 22 May 2013 | Additions & Alterations to Dwelling. Cost $1,181,800 | 27 Feb 2020 | 1 Dwelling - Alts & Adds - DDO and Fence on a lot > 500 m2 and Remove/ 1 Dwelling - Alts & Adds - DDO Fence on a lot > 500 m2 Remove/Destroy or Lop Native Vegetation | | 距離: 0 米 | 地圖位置 | 街景 |
|
| 06 Nov 1998 | Construction of habitable outbuilding | 02 Jun 2010 | 1 Dwelling - New - Lot < 500m2 Construction of a roof deck in a Design Development Overlay Schedule 1 and the removal of vegetation in a Vegetation Protection Overlay 3. Cost $2,000,000 | 25 Oct 2010 | Demolition of Dwelling. Cost $6,800 | 14 Sep 2012 | Construction of Swimming Pool & Safety Barrier. Cost $103,075 | 11 Oct 2012 | Construction of Dwelling - Stage 1 - Basement construction to ground floor slab. Cost $180,000 | | 距離: 26 米 | 地圖位置 | 街景 |
|
| 24 Feb 2004 | Construction of Swimming Pool. Cost $46,000 | 04 Nov 2011 | 1 Dwelling - Alts & Adds - DDO Construction of a roof deck including a first floor addition with floor to ceiling height exceeding 3.5 metres in a Design and Development Overlay 1 | | 距離: 40 米 | 地圖位置 | 街景 |
|
| 13 Jan 2010 | 1 Dwelling - Alts & Adds - DDO Construction of an attic and roof terrace in a Design and Development Overlay 1 | 17 May 2011 | 1 Dwelling - Alts & Adds - DDO Construction of a roof deck in a Design and Development Overlay 1 | | 距離: 47 米 | 地圖位置 | 街景 |
|
| 11 Apr 2008 | VPO3 - Removal x 2 Removal of vegetation in a VPO3. | | 距離: 70 米 | 地圖位置 | 街景 |
|
| 03 May 2010 | Alterations to Dwelling. Cost $6,000 | | 距離: 63 米 | 地圖位置 | 街景 |
|
| 22 Apr 2013 | Additions & Alterations to Dwelling. Cost $7,947 | | 距離: 63 米 | 地圖位置 | 街景 |
|
| 16 Feb 2009 | Remove/Destroy or Lop Native Vegetation Pruning of one (1) tree in a Vegetation Protection Overlay 3 | | 距離: 64 米 | 地圖位置 | 街景 |
|
| 03 Jan 2006 | VPO3 - Removal x 1 Removal of native vegetation in a VPO3 Overlay | 10 Oct 2019 | VPO3 - Removal x 2 Construction of a single dwelling and removal of trees | | 距離: 97 米 | 地圖位置 | 街景 |
|
| 03 Dec 2012 | VPO3 - Removal x 3 Removal of three (3) trees in a Vegetation Protection Overlay 3 & Significant Landscape Overlay 1 | | 距離: 67 米 | 地圖位置 | 街景 |
|
| | |