| X"88 Pakington Street, St Kilda" 附近的改建 |
| 17 Oct 2003 | Front fence. | | 距離: 62 米 | 地圖位置 | 街景 |
|
| 03 Aug 2000 | Alterations to existing block of flats. | 08 Dec 2000 | Construction of a fourth floor level on the existing building to comprise 2 apartments and a dispensation of one car space. | 23 Apr 2002 | Construction of balconies to first & second floors of existing units | 27 May 2002 | PS506173X Twenty four (24) lot residential subdivsion of an existing building and to be constructed fourth level consisting of 2 apartments. | | 距離: 59 米 | 地圖位置 | 街景 |
|
| 14 Aug 2007 | construction of screening to enclose existing balcony | | 距離: 68 米 | 地圖位置 | 街景 |
|
| 29 May 2012 | buildings and works comprising the construction of a rear decking | | 距離: 63 米 | 地圖位置 | 街景 |
|
| 12 Oct 2011 | repairs to exterior | 02 Oct 2012 | external painting of a building in a Heritage Overlay | | 距離: 74 米 | 地圖位置 | 街景 |
|
| 22 Sep 2004 | Signage and building alterations. | 31 Jan 2005 | Buildings and works (associated with hand car wash ancillary to service station use) including timber decking, shade sail and a non- illuminated business identification sign. | 23 Jan 2007 | retrospective approval (associated with hand car wash ancillary to service station use) for the construction of a car wash boom to the western side of the site and associated use of a car wash bay located to south of the storage building | | 距離: 71 米 | 地圖位置 | 街景 |
|
| 20 Dec 2010 | Construction of buildings and works in the form of five dwellings and variation of the design standards set out at Clause 52.06-8 of the Port Phillip Planning Scheme in accordance with the endorsed plans. | 05 Mar 2015 | This application seeks to subdivide the recently constructed apartments that have been constructed | 01 Jun 2015 | Construction of buildings and works in the form of five dwellings and variation of the design standards set out at Clause 52.06-8 of the Port Phillip Planning Scheme in accordance with the endorsed plans. Including amendment to allow a change in posi | | 距離: 69 米 | 地圖位置 | 街景 |
|
| 22 Feb 1999 | Subdivision | | 距離: 76 米 | 地圖位置 | 街景 |
|
| 02 May 2014 | Construction of veranda style roof over existing balcony | | 距離: 76 米 | 地圖位置 | 街景 |
|
| 03 Feb 2006 | part demolition, ground and first floor alterations and additions to existing dwelling | 30 Dec 2008 | construction of a front & side fence and gate | | 距離: 106 米 | 地圖位置 | 街景 |
|
| | |