Toorak 平均房價House 價格比去年下降26% . 周邊地區Armadale | $1,834,800 | Burnley | $1,272,500 | Hawthorn | $2,343,700 | Kooyong | $2,232,000 | Malvern | $2,251,400 | Prahran | $1,627,600 | South Yarra | $1,883,300 | Toorak Median RentThe House rent is 上升26% .
| X"22 Lansell Road, Toorak" 附近的改建 |
| 27 Feb 2020 | Domestic Residence 1/30 Lansell Road Toorak to have an additional dwelling added to Title "1A/30" - No requirement to alter exterior boundaries. | | 距離: 159 米 | 地圖位置 | 街景 |
|
| 18 May 2009 | Construction of a staircase within a Special Building Overlay. Cost $25,000. Status: Lapsed | | 距離: 115 米 | 地圖位置 | 街景 |
|
| 03 Sep 2014 | Demolition of existing dwelling and subsequent construction of a new dwelling on a lot within a Heritage Overlay and Special Building Overlay. Cost $6,800,000. Status: Issued | | 距離: 190 米 | 地圖位置 | 街景 |
|
| 被市政府指定為 Victorian heritage | | 距離: 165 米 | 地圖位置 | 街景 |
|
| 04 Oct 2011 | Application to amend approved planning permit and/or plans - removal of trees | | 距離: 161 米 | 地圖位置 | 街景 |
|
| 07 Sep 2012 | Construction of a multi-dwelling development in a Residential 1 Zone and reduction in the car parking requirements. Cost $45,000,000. Status: Failure | 03 Feb 2014 | 18 Lot Subdivision | 05 Feb 2014 | Eighteen (18) Lot Subdivision & Common Property - PS 723298 P. Status: Issued | 02 May 2014 | Secondary Consent Amendment to approved plans - Various Changes. Status: Issued | 16 Dec 2014 | Secondary Consent Amendment to approved Plans for various changes. Status: Issued | 16 Dec 2014 | Amendment to approved Planning Permit and/or Plans - multiple changes to plans | 26 Aug 2015 | Secondary Consent Amendment to approved plans - Revisions to endorsed plans to clarify perforated metal screen (MF02) and show inclusion of new perforated panels. Changes to basement plans.. Cost $8,000 | | 距離: 179 米 | 地圖位置 | 街景 |
|
| 11 Mar 2015 | Construction of a domestic swimming pool and associated mechanical and safety equipment in a Heritage Overlay. Cost $45,000. Status: Issued | | 距離: 222 米 | 地圖位置 | 街景 |
|
| 14 Jul 2011 | Construction of two or more dwellings on a lot in a Residential 1 Zone. Cost $2,000,000. Status: NOD | 02 Jun 2014 | Secondary Consent Amendment to approved Plans comprising changes to the internal layout, footprint of the basement, external opening and a minor increase in the overall building height. Status: Issued | 26 Oct 2014 | 2 lot subdivision in support of existing development permit | 07 Nov 2014 | Two (2) Lot Subdivision & Common Property - PS 731641 H. Status: Issued | 08 Sep 2015 | Amendment to approved Planning Permit and/or Plans - Various modifications | | 距離: 208 米 | 地圖位置 | 街景 |
|
| 18 Aug 2011 | Construction of two dwellings on a lot in a Residential 1 Zone. Cost $1,300,000. Status: Failure | | 距離: 195 米 | 地圖位置 | 街景 |
|
| 29 Mar 2007 | Rainwater tank within a Special Building Overlay. Cost $20,000. Status: Issued | 17 Jun 2015 | Building and works to a dwelling in a Special Building Overlay. Cost $1,500,000 | 22 Jul 2015 | Section 23 Removal of Sewerage Easement | 22 Jul 2015 | Removal of sewerage easement E-1 on creation of easement 587765 Removal of sewerage easement E-1 on more... | | 距離: 188 米 | 地圖位置 | 街景 |
|
| | |