Warrandyte 平均房價House 價格比去年下降5% . 周邊地區Doncaster East | $1,635,500 | Donvale | $1,560,900 | Eltham | $1,261,400 | Park Orchards | $2,000,200 | Templestowe | $1,712,700 | Warrandyte South | $1,913,700 | Wonga Park | $1,494,100 | Warrandyte Median RentThe House rent is 上升40% .
| X"3 Glamis Street, Warrandyte" 附近的改建 |
| 20 Oct 2003 | Construction of a dwelling and associated earthworks and vegetation removal.. Estimated Cost: $250000 | 22 Feb 2011 | LAPSED Construction of a single storey dwelling and associated vegetation removal. Estimated Cost: $300000 | 21 Oct 2013 | Buildings and works, including vegetation removal associated with the construction of a dwelling,.. Estimated Cost: $500000 | 17 Aug 2016 | Native Vegetation Removal - two native trees | | 距離: 129 米 | 地圖位置 | 街景 |
|
| 22 Dec 1995 | A DWELLING. Estimated Cost: $250000 | 01 Jul 1997 | A DWELLING. Estimated Cost: $100000 | 28 May 2002 | Construction of a dwelling, tennis court and associated earthworks. Estimated Cost: $300000 | | 距離: 145 米 | 地圖位置 | 街景 |
|
| 26 Sep 1994 | A DWELLING. Estimated Cost: $180000 | 01 Apr 1996 | GARAGE. Estimated Cost: $7500 | | 距離: 196 米 | 地圖位置 | 街景 |
|
| 21 Jun 2001 | TREE REMOVAL TREE REMOVAL. Estimated Cost: $600 | | 距離: 146 米 | 地圖位置 | 街景 |
|
| 21 Mar 2002 | ADDITIONS CONSTRUCT OF A VERANDAH. Estimated Cost: $9500 | 14 May 2007 | The removal of one (1) native tree and the lopping of one (1) native tree | 03 Dec 2007 | Buildings and works for the construction of alterations and additions to an existing dwelling.. Estimated Cost: $28000 | | 距離: 165 米 | 地圖位置 | 街景 |
|
| 22 Jul 1992 | LANDFILL. Estimated Cost: $2000 | 17 Sep 1993 | A DWELLING. Estimated Cost: $120000 | 02 Oct 1996 | DECKING. Estimated Cost: $4500 | 24 Aug 2000 | SWIMMING POOL SWIMMING POOL. Estimated Cost: $19900 | | 距離: 167 米 | 地圖位置 | 街景 |
|
| 11 Oct 2011 | Alterations and additions to the existing dwelling comprising the construction of an outbuilding, porch, deck and associated vegetation removal. Estimated Cost: $100000 | | 距離: 152 米 | 地圖位置 | 街景 |
|
| 10 Nov 1998 | Subdivision, works, removal of native vegetation within common property and removal of easements | 10 Jul 2002 | Construction of a dwelling and associated earthworks. Estimated Cost: $160000 | 17 Nov 2003 | Construction of a dwelling. Estimated Cost: $350000 | 26 Aug 2008 | Buildings and works associated with the construction of a pool house.. Estimated Cost: $25000 | | 距離: 204 米 | 地圖位置 | 街景 |
|
| 27 May 2002 | WITHDRAWN PROPOSED RESIDENCE, VEG REMOVAL, EXCAVATION, VERANDAH, POOL ENCLOSURE. Estimated Cost: $350000 | 13 Oct 2003 | Buildings and works, including vegetation removal, associated with the construction of a double storey dwelling.. Estimated Cost: $250000 | 09 Oct 2008 | Removal of vegetation | | 距離: 153 米 | 地圖位置 | 街景 |
|
| 09 Dec 1992 | A DWELLING. Estimated Cost: $40000 | 19 Jun 2002 | NO PERMIT REQUIRED EARTHWORKS | | 距離: 215 米 | 地圖位置 | 街景 |
|
| | |