Templestowe 平均房價House 價格比去年下降4% . 周邊地區Doncaster | $1,474,300 ![](/img/up.gif) | Doncaster East | $1,635,500 ![](/img/up.gif) | Eltham | $1,261,400 ![](/img/up.gif) | Lower Plenty | $1,582,800 ![](/img/up.gif) | Templestowe Lower | $1,364,700 ![](/img/down.gif) | Warrandyte | $1,605,100 ![](/img/down.gif) | Templestowe Median RentThe House rent is 上升14% .
| X"202/12 Swilk Street, Templestowe" 附近的改建 |
| 21 Dec 2011 | Construction of a three (3) storey apartment building comprising twelve (12) units and basement level car park. Estimated Cost: $893000 | 27 Nov 2015 | Subdivide the approved apartment development currently under construction. | 01 Dec 2015 | Construction of 3 storey apartment building comprising 12 dwellings and basement car park. | | 距離: 0 米 | 地圖位置 | 街景 |
|
| 29 Mar 2017 | Restaurant and cafe Licence | | 距離: 20 米 | 地圖位置 | 街景 |
|
| 29 Jun 1999 | SUBDIVISION SUBDIVISION RUFFEY | | 距離: 49 米 | 地圖位置 | 街景 |
|
| 05 Jul 1999 | DUAL OCCUPANCY DUAL OCCUPANCY LOT 21 LP 50969 RUFFEY. Estimated Cost: $180000 | 24 Apr 2007 | Two lot subdivision | | 距離: 79 米 | 地圖位置 | 街景 |
|
| 14 Sep 2007 | Construction of two two-storey dwellings. Estimated Cost: $600000 | 24 Jul 2008 | Two lot subdivision SPEAR APPLICATION S001948S | | 距離: 95 米 | 地圖位置 | 街景 |
|
| 07 Feb 2000 | WITHDRAWN Signage. Estimated Cost: $3500 | 30 Apr 2009 | Buildings and works associated with the extension of an existing child care centre building (to allow an enrolment increase) and a playground extension onto adjoining land, the use of land for a childcare centre (playground) and works associated with | 05 Nov 2015 | Buildings and Works associated with the Child Care Centre. Estimated Cost: $200000 | | 距離: 74 米 | 地圖位置 | 街景 |
|
| 24 Oct 1984 | FLATS | 04 Oct 1985 | FLATS | | 距離: 75 米 | 地圖位置 | 街景 |
|
| 03 Dec 1984 | FLATS | | 距離: 76 米 | 地圖位置 | 街景 |
|
| 17 Aug 2006 | Construction of a shed garage and storage space. Estimated Cost: $3000 | 21 Aug 2013 | Construction of a replacement verandah roof. Estimated Cost: $9890 | | 距離: 98 米 | 地圖位置 | 街景 |
|
| 17 Oct 2002 | Buildings and works at a preschool. Estimated Cost: $30000 | 14 Dec 2004 | Alterations to pre-school.. Estimated Cost: $18900 | | 距離: 96 米 | 地圖位置 | 街景 |
|
| | |