Templestowe 平均房價House 價格比去年下降4% . 周邊地區Doncaster | $1,474,300 | Doncaster East | $1,635,500 | Eltham | $1,261,400 | Lower Plenty | $1,582,800 | Templestowe Lower | $1,364,700 | Warrandyte | $1,605,100 | Templestowe Median RentThe House rent is 上升14% .
| X"3 Concord Rise, Templestowe" 附近的改建 |
| 06 Sep 1989 | TENNIS CRT LTG. Estimated Cost: $2000 | | 距離: 242 米 | 地圖位置 | 街景 |
|
| 18 Dec 1998 | DWELLING DWELLING LOT 34 LP 204256 RUFFEY. Estimated Cost: $283061 | 26 Nov 1999 | SWIMMING POOL SWIMMING POOL LOT 34 LP204256 RUFFEY. Estimated Cost: $24920 | | 距離: 194 米 | 地圖位置 | 街景 |
|
| 04 Jul 1997 | DWELLING. Estimated Cost: $240000 | 16 Aug 2004 | Use and development of an illuminated tennis court and construction of a pergola, water feature and conservatory.. Estimated Cost: $30000 | 01 Dec 2005 | Addition of a shed. Estimated Cost: $210 | | 距離: 197 米 | 地圖位置 | 街景 |
|
| 24 May 1990 | TENNIS CRT LTG. Estimated Cost: $3500 | 20 Mar 2009 | Alterations and additions to the existing dwelling and driveway areas and native vegetation removal. Estimated Cost: $800000 | | 距離: 231 米 | 地圖位置 | 街景 |
|
| 07 Apr 2017 | 3 Lot Subdivision | | 距離: 251 米 | 地圖位置 | 街景 |
|
| 28 Nov 1995 | GARAGE | | 距離: 190 米 | 地圖位置 | 街景 |
|
| 06 Jan 1997 | A DWELLING. Estimated Cost: $241000 | 22 Sep 1998 | SWIMMING POOL SWIMMING POOL LOT 4 LP 207229 RUFFEY. Estimated Cost: $23000 | 16 Aug 2001 | ADDITION OUTBUILDING | | 距離: 240 米 | 地圖位置 | 街景 |
|
| 24 Feb 1989 | SUBDIVISION | 21 Jul 1998 | SUBDIVISION SUBDIVISIONS RUFFEY | 17 Feb 1999 | TREE REMOVAL TREE REMOVAL LOT 1 LP 139021 RUFFEY | 24 Aug 1999 | A DWELLING A DWELLING RUFFEY RUFFEY. Estimated Cost: $300000 | 15 Jun 2000 | SUBDIVISION BOUNDARY RE-ALIGNMENT - SUBDIVISION | | 距離: 251 米 | 地圖位置 | 街景 |
|
| 09 Dec 1999 | WORKS WORKS TIKALARA PARK MULLUM | 31 Dec 2001 | PATH WORKS ASSOCIATED WITH THE CONSTRUCTION OF A PATH | | 距離: 254 米 | 地圖位置 | 街景 |
|
| 30 Apr 2001 | WITHDRAWN SINGLE STOREY DWELLING. Estimated Cost: $250000 | 18 Jul 2002 | Buildings and works associated with the construction of a double storey dwelling. Estimated Cost: $330000 | 10 Sep 2003 | Buildings and works associated with the construction of a non-illuminated tennis court. Estimated Cost: $54032 | 30 Dec 2003 | Earthworks associated with the construction of a swimming pool.. Estimated Cost: $30000 | | 距離: 250 米 | 地圖位置 | 街景 |
|
| | |