Templestowe 平均房價House 價格比去年下降4% . 周邊地區Doncaster | $1,474,300 | Doncaster East | $1,635,500 | Eltham | $1,261,400 | Lower Plenty | $1,582,800 | Templestowe Lower | $1,364,700 | Warrandyte | $1,605,100 | Templestowe Median RentThe House rent is 上升14% .
| X"3 Cliveden Court, Templestowe" 附近的改建 |
| 11 May 1989 | TENNIS CRT LTG. Estimated Cost: $3500 | | 距離: 37 米 | 地圖位置 | 街景 |
|
| 14 Aug 1989 | 3-STOREY HOUSE. Estimated Cost: $140000 | 08 Oct 1990 | SUBDIVISION | 11 Feb 2002 | SWIMMING POOL SWIMMING POOL. Estimated Cost: $18000 | 30 Jun 2006 | Earthworks associated with the construction of an inground swimming pool.. Estimated Cost: $30000 | 30 Mar 2009 | Buildings and works associated with the construction of a garage. Estimated Cost: $6000 | | 距離: 73 米 | 地圖位置 | 街景 |
|
| 28 Nov 1995 | GARAGE | | 距離: 88 米 | 地圖位置 | 街景 |
|
| 04 Jul 1997 | DWELLING. Estimated Cost: $240000 | 16 Aug 2004 | Use and development of an illuminated tennis court and construction of a pergola, water feature and conservatory.. Estimated Cost: $30000 | 01 Dec 2005 | Addition of a shed. Estimated Cost: $210 | | 距離: 122 米 | 地圖位置 | 街景 |
|
| 24 Apr 2012 | NPR Construction of a deck. Estimated Cost: $5000 | | 距離: 98 米 | 地圖位置 | 街景 |
|
| 19 Jul 1996 | A DWELLING. Estimated Cost: $183000 | 17 Mar 2005 | WITHDRAWN Removal of 1 Gum Tree (Dead) | 22 Nov 2010 | Buildings and works associated with the construction of a garage, and installation of a water tank. Estimated Cost: $50000 | | 距離: 135 米 | 地圖位置 | 街景 |
|
| 30 Apr 2001 | WITHDRAWN SINGLE STOREY DWELLING. Estimated Cost: $250000 | 18 Jul 2002 | Buildings and works associated with the construction of a double storey dwelling. Estimated Cost: $330000 | 10 Sep 2003 | Buildings and works associated with the construction of a non-illuminated tennis court. Estimated Cost: $54032 | 30 Dec 2003 | Earthworks associated with the construction of a swimming pool.. Estimated Cost: $30000 | | 距離: 86 米 | 地圖位置 | 街景 |
|
| 22 Feb 2002 | ERECTION OF A STORAGE SHED. Estimated Cost: $15000 | | 距離: 93 米 | 地圖位置 | 街景 |
|
| 06 Jan 1997 | A DWELLING. Estimated Cost: $241000 | 22 Sep 1998 | SWIMMING POOL SWIMMING POOL LOT 4 LP 207229 RUFFEY. Estimated Cost: $23000 | 16 Aug 2001 | ADDITION OUTBUILDING | | 距離: 104 米 | 地圖位置 | 街景 |
|
| 22 Sep 2011 | Buildings and works for the installation of a 40,000 litre water tank.. Estimated Cost: $5000 | | 距離: 200 米 | 地圖位置 | 街景 |
|
| | |