Warrandyte 平均房價House 價格比去年下降5% . 周邊地區Doncaster East | $1,635,500 | Donvale | $1,560,900 | Eltham | $1,261,400 | Park Orchards | $2,000,200 | Templestowe | $1,712,700 | Warrandyte South | $1,913,700 | Wonga Park | $1,494,100 | Warrandyte Median RentThe House rent is 上升40% .
| X"8 Alan Place, Warrandyte" 附近的改建 |
| 18 Feb 2020 | Construction of a deck that exceeds 1m above natural ground | | 距離: 47 米 | 地圖位置 | 街景 |
|
| 31 Jan 1992 | A DWELLING. Estimated Cost: $80000 | | 距離: 46 米 | 地圖位置 | 街景 |
|
| 14 Oct 2015 | Buildings and works for the construction of a carport. Estimated Cost: $20000 | | 距離: 41 米 | 地圖位置 | 街景 |
|
| 20 Oct 1997 | EXTENSIONS. Estimated Cost: $120000 | 14 Apr 2008 | Buildings and works for the construction of alterations and additions to the existing dwelling. Estimated Cost: $70000 | | 距離: 46 米 | 地圖位置 | 街景 |
|
| 10 Apr 2007 | Buildings and works associated with alterations and additions to the existing dwelling with a site coverage greater than 25\% and a setback from a side boundary of less than 1.8m, and vegetation removal.. Estimated Cost: $120000 | | 距離: 61 米 | 地圖位置 | 街景 |
|
| 08 May 1990 | NATIVE VEG REM | | 距離: 61 米 | 地圖位置 | 街景 |
|
| 05 Nov 2017 | Buildings and works for the construction of a garage | | 距離: 79 米 | 地圖位置 | 街景 |
|
| 26 Mar 2003 | Vegetation removal | 16 Mar 2004 | NO PERMIT REQUIRED Installation of Water Tank. Estimated Cost: $4200 | 26 May 2006 | Earthworks and native vegetation removal. Estimated Cost: $57000 | | 距離: 76 米 | 地圖位置 | 街景 |
|
| 22 Aug 1995 | GARAGE. Estimated Cost: $10000 | | 距離: 94 米 | 地圖位置 | 街景 |
|
| 04 Feb 1997 | A DWELLING. Estimated Cost: $100000 | | 距離: 77 米 | 地圖位置 | 街景 |
|
| | |